File #: 19-0051    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 1/11/2019 In control: Franklin Municipal Planning Commission
On agenda: 1/24/2019 Final action: 1/24/2019
Title: Bushnell Farm PUD Subdivision, Final Plat, Creating 14 Single-Family Residential Lots, One Multifamily Lot And Six Open Space Lots On 9.74 Acres, Located At 1495 And 1521 Lewisburg Pike. (CONSENT AGENDA)
Sponsors: Ald. Ann Petersen, Emily Hunter, Amy Diaz-Barriga, Christopher Andrews
Attachments: 1. MAP - 6881 - Bushnell Farm PUD Subdivision Final Plat, 2. COA - 6881-Conditions of Approval_01, 3. PLAT - COF 6881 Bushnell Farm Final Plat 2019-01-03

DATE: January 16, 2019

TO: Franklin Municipal Planning Commission

FROM: Christopher Andrews, Principal Planner
Amy Diaz-Barriga, Current Planning Supervisor
Emily Hunter, Director of Planning and Sustainability

Subject
title
Bushnell Farm PUD Subdivision, Final Plat, Creating 14 Single-Family Residential Lots, One Multifamily Lot And Six Open Space Lots On 9.74 Acres, Located At 1495 And 1521 Lewisburg Pike. (CONSENT AGENDA)
body

Project Information
COF Project Number: 6881
Applicant: Clay Wallace, Energy Land & Infrastructure, LLC
Owner: Tyler Ring, Stream Valley Franklin, LLC

Background/Staff Comments
The applicant is seeking approval of a final plat for 14 single-family lots, one multifamily lot and six open space lots in the creation of the Bushnell Farm PUD Subdivision. The subdivision is located within the Conservation Subdivision design concept within Envision Franklin and preserves at least 50 percent open space. The project development plan was approved in September 2017, while the site plan gained approval in April 2018.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The mylar shall be 18 inches by 24 inches in size. The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review. With the resubmittal, each condition of approval...

Click here for full text