File #: 19-0051    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 1/11/2019 In control: Franklin Municipal Planning Commission
On agenda: 1/24/2019 Final action: 1/24/2019
Title: Bushnell Farm PUD Subdivision, Final Plat, Creating 14 Single-Family Residential Lots, One Multifamily Lot And Six Open Space Lots On 9.74 Acres, Located At 1495 And 1521 Lewisburg Pike. (CONSENT AGENDA)
Sponsors: Ald. Ann Petersen, Emily Hunter, Amy Diaz-Barriga, Christopher Andrews
Attachments: 1. MAP - 6881 - Bushnell Farm PUD Subdivision Final Plat, 2. COA - 6881-Conditions of Approval_01, 3. PLAT - COF 6881 Bushnell Farm Final Plat 2019-01-03

 

DATE:                                                               January 16, 2019

 

TO:                                          Franklin Municipal Planning Commission

 

FROM:                                          Christopher Andrews, Principal Planner

                                          Amy Diaz-Barriga, Current Planning Supervisor

                                          Emily Hunter, Director of Planning and Sustainability

 

Subject

title

Bushnell Farm PUD Subdivision, Final Plat, Creating 14 Single-Family Residential Lots, One Multifamily Lot And Six Open Space Lots On 9.74 Acres, Located At 1495 And 1521 Lewisburg Pike. (CONSENT AGENDA)                                          

body

 

Project Information

COF Project Number:                     6881

Applicant:                                          Clay Wallace, Energy Land & Infrastructure, LLC

Owner:                                          Tyler Ring, Stream Valley Franklin, LLC

 

Background/Staff Comments

The applicant is seeking approval of a final plat for 14 single-family lots, one multifamily lot and six open space lots in the creation of the Bushnell Farm PUD Subdivision. The subdivision is located within the Conservation Subdivision design concept within Envision Franklin and preserves at least 50 percent open space. The project development plan was approved in September 2017, while the site plan gained approval in April 2018.

 

Recommendation

recommendation

Approval, with conditions. 

end

See attached pages for a list of staff recommended conditions of approval.

 

PROCEDURAL REQUIREMENTS:                     

1.                     In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The mylar shall be 18 inches by 24 inches in size.  The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review.  With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.

2.                     The city’s project identification number shall be included on all correspondence with any city department relative to this project.

3.                     The applicant shall upload a .dwg copy of the final plat through the IDT system (link above) in Tennessee state plan coordinates, NAD 83, NAVD 88, zone 4100/5301 for incorporation of the plat into the Franklin GIS database.