Meeting Name: Capital Investment Committee Agenda status: Final
Meeting date/time: 1/24/2019 4:00 PM Minutes status: Final  
Meeting location: Board Room
Published agenda: Agenda Agenda Published minutes: Action Summary/Minutes Action Summary/Minutes  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
19-0093 11. MinutesConsideration of Minutes from November 29, 2018.approvedPass Action details Video Video
18-1245 12. Contract/AgreementConsideration of a Request for Sanitary Sewer Availability Approval for 4034 Clovercroft Road (MAP 79 PARCEL 56.01) (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0087 13. Contract/AgreementConsideration of a Variance from Title 18 for the 1215 Hillsboro Road (MAP 052, PARCEL 00700), Christ Community Church. (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
18-1028 14. Contract/AgreementConsideration of Final Change Order to the Construction Contract (COF Contract No. 2015-0062) for the Water Treatment Plant Modifications Project with Judy Construction, Inc. for a Cost DECREASE of $79,790.00 and a Time Reduction of 15 days (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0036 15. Contract/AgreementConsideration of Final Reconciling Change Order to Construction Contract (COF Contract No. 2017-0198) with Civil Constructors, LLC for the Goose Creek Inn Sanitary Sewer Extension Project for a Decrease in the Amount of $89,195.80 and a Time Extension Through August 24, 2018. (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0037 16. Contract/AgreementConsideration of the Final Reconciling Change Order to the Construction Contract (COF Contract No. 2014-0288) with Revere Control Systems, Inc. for the Water Distribution and Collection System SCADA Improvements Project for a Decrease in the Amount of $116,828.98 and a Time Extension of 297 calendar days. (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0017 17.RES 2019-01 Flood Ins Rate Mapping - Ralston BranchContract/AgreementConsideration of Resolution 2019-01, “A Resolution Directing Staff to Proceed with the Flood Insurance Rate Mapping Associated with Ralston Branch”. (Referred to 2/12/19 WS from 1/24/19 CIC 4-0; 2/12/19 WS, 05/19/19 WS)referredPass Action details Video Video
19-0028 18. ResolutionConsideration of Resolution 2019-02, “A Resolution Approving the Preliminary Design of the East Main Street/Franklin Road Bridge Over the Harpeth River”. (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0054 19. Contract/AgreementConsideration of Change Order No. 2 (FINAL) to the Construction Contract (COF Contract No. 2017-0006) for the SR-96 East Sidewalk Project with Civil Constructors, LLC for a Cost Increase of $208,684.31 and a Time Extension of 68 Days. (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0100 110. Contract/AgreementConsideration of Amendment No. 3 to the Professional Services Agreement (COF Contract No. 2017-0007) with Barge Design Solutions, Inc. for the Design of Intersection Improvements at East McEwen Drive and Cool Springs Boulevard for a Cost Increase Not-to-Exceed $15,950.00 (01/24/19 CIC 4-0)referred as a Consent ItemPass Action details Video Video
19-0101 111. ReportCapital Projects Status Reportacknowledged  Action details Video Video
19-0088 112. Contract/AgreementWater and Sewer Project Statusacknowledged  Action details Video Video