15-0820
| 1 | 1. | | Minutes | Approval of Minutes from August 27, 2015. | approved | Pass |
Action details
|
Video
|
15-0863
| 1 | 2. | PSA with SSR for Water Line Relocation Design | Contract/Agreement | Consideration of a Professional Services Agreement (COF Contract No. 2015-0292) with Smith Seckman Reid, Inc. (SSR) for the Water Line Relocation Design on the Franklin Road Corridor Improvements Project, from the Harpeth River Bridge to Harpeth Industrial Court, for a Lump Sum Fee of $55,500.00 (09/24/15 CIC 3-0) | referred | Pass |
Action details
|
Video
|
15-0864
| 1 | 3. | PSA with SSR for Sewer Line Relocation Design | Contract/Agreement | Consideration of a Professional Services Agreement (COF Contract No. 2015-0293) with Smith Seckman Reid, Inc. (SSR) for the Sanitary Sewer Line Relocation Design on the Franklin Road Corridor Improvements Project, from the Harpeth River Bridge to Harpeth Industrial Court, for a Lump Sum Fee of $24,500.00 (09/24/15 CIC 3-0) | referred | Pass |
Action details
|
Video
|
15-0880
| 1 | 4. | Discussion - No turn on red at Royal Oaks / 96 E | Report | Discussion to install a NO TURN ON RED for the northbound at Royal Oaks Boulevard right turn movement onto Murfreesboro Road (SR 96 East) | referred | |
Action details
|
Video
|
15-0865
| 1 | 5. | | Report | Transportation Projects Status Report | | |
Action details
|
Video
|
15-0866
| 1 | 6. | | Report | Water and Sewer Projects Status Report | | |
Action details
|
Video
|
15-0867
| 1 | 7. | | Report | Stormwater Projects Status Report | | |
Action details
|
Video
|