File #: 19-1122    Version: 1 Name:
Type: Contract/Agreement Status: Agenda Ready
File created: 10/17/2019 In control: Capital Investment Committee
On agenda: 10/24/2019 Final action:
Title: Consideration of a DRAFT Professional Services Agreement (COF Contract No. 2019-0322) with Gresham Smith for Design and Post-Design Services for the SR-96 (Murfreesboro Road) Traffic Signal Improvements in a Lump Sum Amount of $268,218.60
Sponsors: Engineering
Attachments: 1. Contract_2019-0322_PSA_GreshamSmith_SR96TrafficSignal.pdf, 2. Contract_2019-0322_Scope_GreshamSmith_SR96TrafficSignal.pdf

DATE: October 17, 2019

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
Paul Holzen, City Engineer/Director of Engineering
Jonathan Marston, Assistant Director of Engineering
Adam Moser, Traffic Engineer 3

SUBJECT:
title
Consideration of a DRAFT Professional Services Agreement (COF Contract No. 2019-0322) with Gresham Smith for Design and Post-Design Services for the SR-96 (Murfreesboro Road) Traffic Signal Improvements in a Lump Sum Amount of $268,218.60
body

Purpose
The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning a Professional Services Agreement (PSA) with Gresham Smith for the SR-96 Traffic Signal Improvements.

Background
In July 2018, the City was notified that it had been selected to receive $1,550,000 in federal funds through the Congestion Mitigation & Air Quality (CMAQ) 2017 grant cycle for the proposed improvements to the traffic signals along the SR-96 (Murfreesboro Road) corridor. The purpose of this project is to improve traffic operations for the 13 signalized intersections along the project corridor between Eddy Lane and Arno Road.

The project generally includes: the implementation of Automated Traffic Signal Performance Measures (ATSPMs), the deployment of Signal Phase and Timing (SPaT) hardware and broadcasts, the installation of Flashing Yellow Arrows (FYAs) where applicable, the replacement of traffic signal controllers with new Advanced Traffic Controllers (ATCs), the installation of improved vehicle detection, and the update of signal timings to account for the improvements to the 13 signalized intersections along Murfreesboro Road (SR-96), between Eddy Lane and Arno Road.

Since last year, the City has completed the project initiation paperwork with the Tennessee Department of Transportation (TDOT) to allow the City to manage this project locally. TDOT has also issued the Notice to Proceed for Design. After a qualifications base...

Click here for full text