File #: 19-1116    Version: 1 Name:
Type: Contract/Agreement Status: Agenda Ready
File created: 10/16/2019 In control: Capital Investment Committee
On agenda: 10/24/2019 Final action:
Title: Consideration of DRAFT Amendment No. 2 to the Professional Services Agreement (COF Contract No. 2018-0062) with Alfred Benesch & Company for the Design of Intersection Improvements at the McEwen Drive Interchange with I-65 for a Cost Increase Not-to-Exceed $14,345.00
Sponsors: Engineering
Attachments: 1. Contract_2018_0062_Amend2_Benesch_McEwenI65InterchangeMods.pdf, 2. Contract_2018_0062_Amend2AttachmentA_Benesch_McEwenI65InterchangeMods.pdf

DATE: October 16, 2019

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
Paul Holzen, City Engineer/Director of Engineering
Jonathan Marston, Assistant Director of Engineering

SUBJECT:
title
Consideration of DRAFT Amendment No. 2 to the Professional Services Agreement (COF Contract No. 2018-0062) with Alfred Benesch & Company for the Design of Intersection Improvements at the McEwen Drive Interchange with I-65 for a Cost Increase Not-to-Exceed $14,345.00
body

Purpose
The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning Amendment No. 2 to the Professional Services Agreement (PSA) with Alfred Benesch & Company (Benesch).

Background
On May 8, 2018, the BOMA approved a PSA (COF Contract No. 2018-0062) with Benesch for the design of intersection improvements at the McEwen Drive interchange with I-65 in the amount of $28,365.60. The purpose of this design was to allow for the opening of a second left-turn lane from westbound McEwen Drive to the southbound entrance ramp to I-65 in an effort to accommodate increasing traffic in the area.

Following completion of the preliminary design, the design team shared the plans with TDOT to obtain their approval prior to final design. TDOT staff asked the design team to analyze the potential queue and delay that the additional left-turn lane may cause on the opposing right-turn movement from McEwen Drive. This analysis revealed the need for significant modifications to the westbound right-turn lane from McEwen Drive. On December 11, 2018, the BOMA approved Amendment No. 1 to the PSA for a cost increase of $35,015.20 to design the needed right-turn lane modifications.

As plans neared completion, staff determined that some additional work was needed to: (1) check for the feasibility and possible need for widening of the northbound I-65 exit ramp onto eastbound McEwen Drive, (2) provide additional utility coordination, and (3) cr...