File #: 19-0838    Version: 1 Name:
Type: Item Approved on Behalf of the Board Status: Passed
File created: 8/14/2019 In control: Board of Mayor & Aldermen
On agenda: 8/27/2019 Final action:
Title: Contract No. 2019-0119 Between City of Franklin and Liquid Engineering for Tank Inspection Services for the Long Lane Tank.
Sponsors: Michelle Hatcher
Attachments: 1. Liquid Engineering 2019-0119.pdf

 

DATE:                                                               August 14, 2019

 

TO:                                          Board of Mayor and Aldermen

 

FROM:                                          Michelle Hatcher, Director of Water Management

                     

                                          

SUBJECT:                                          

title

Contract No. 2019-0119 Between City of Franklin and Liquid Engineering for Tank Inspection Services for the Long Lane Tank.

body

 

Purpose

The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning the inspection services provided by Liquid Engineering for the inspection and reporting of the Long Lane reservoir.

 

Background

The WMD is considering using this tank as reclaimed water storage as provided in the recommendations from the Reclaimed Water Master Plan report that the WMD is currently working through. The tank would provide reclaimed water storage during peak times when demand is highest on the south part of town where development need is the largest. 

 

The WMD enlisted Liquid Engineering to perform the inspection so we could be sure the structural integrity of the tank, in addition to the appurtenances, were adequate to reuse for reclaimed water.

 

Financial Impact

The total contract amount is $1,145 since this was done in conjunction with the inspection of the other water tanks.