File #: 19-0772    Version: 2 Name:
Type: Report Status: Agenda Ready
File created: 7/30/2019 In control: Work Session
On agenda: 8/13/2019 Final action:
Title: Presentation of Parkview Drainage Study
Sponsors: Paul Holzen, Jonathan Marston
Attachments: 1. BOMA Presentation 8-13-2019.pdf, 2. 1995_Parkview Drainage Report.pdf, 3. Parkview Drainage Study Report_Final.pdf, 4. PARKVIEW DRAINAGE STUDY.PDF

 

DATE:                                                               July 30, 2019

 

TO:                                          Board of Mayor and Aldermen

 

FROM:                                          Eric Stuckey, City Administrator

                                          Paul P. Holzen, City Engineer/Director of Engineering

                                          Jonathan Marston, Assistant Director of Engineering

                                          

SUBJECT:                                          

title

Presentation of Parkview Drainage Study

body

 

Purpose

The purpose of this memorandum is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning the Parkview Drainage Study

 

Background

Localized flooding in the Parkview Drive / Evans Street area has been a problem for many years within the City of Franklin.  The existing infrastructure is undersized and inadequate to handle small storm events.  Infill development in this area has increased the awareness of the problem and filled in areas of natural detention within the basin.  This infill development and increased runoff have created the need for an improved stormwater conveyance system.  This area has been studied numerous times, dating back to 1982, and the results are always similar.  The purpose of this memo/report is to provide recommendations to the Board to determine if and how to proceed with a possible capital project.  The studies have been attached for review. 

 

Financial Impact

Option 1 - The estimated cost is around $17,000,000 and includes a full rebuild of all utilities within Church Street and Evans Street

 

Option 2 - Estimated cost is around $10,000,000 and would include building storm infrastructure from Sharpes Branch to Evans Street.  This project may not be possible given the urban constraints and existing floodplain within the area.  This cost does not include the proposed water/sewer project that would be needed on Church Street at an estimated cost of $2,000,000.

 

Option 3 - The estimated cost is around $5,000,000 and includes the construction of a pump station and force main.  Engineering/public works staff do not generally support the installation of pump stations due to long term operations and maintenance concerns.  This cost does not include the proposed water/sewer project that would still be needed on Church Street at an estimated cost of $2,000,000.

 

Recommendation

rec

Staff is seeking feedback from the Board of Mayor and Aldermen to determine if and how to proceed with this project.