File #: 18-0506    Version: 1 Name:
Type: Contract/Agreement Status: New Business
File created: 5/9/2018 In control: Work Session
On agenda: 5/22/2018 Final action: 5/22/2018
Title: Consideration of the USACE Harpeth River Watershed Feasibility Study and the Recommended Project Options for the City of Franklin (Flood Study, CORP of Engineers) (05/22/18 WS)
Sponsors: Paul Holzen, Jonathan Marston, William Banks
Attachments: 1. Exhibit_A_Franklin_Raises_05-08-2018
Related files: 18-0587

DATE: May 14, 2018

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
Paul Holzen, Director of Engineering
Jonathan Marston, Assistant Director of Engineering
William Banks, Staff Engineer

SUBJECT:

title
Consideration of the USACE Harpeth River Watershed Feasibility Study and the Recommended Project Options for the City of Franklin (Flood Study, CORP of Engineers) (05/22/18 WS)
body

Purpose
The purpose of this memorandum is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning how to move forward with the USACE Harpeth River Watershed Feasibility Study

Background
The May 2010 flood event created devastation throughout the Harpeth River Watershed and caused 4 fatalities and over $480 million in direct economic impacts in the Harpeth River Watershed alone. For this reason, the Department of the Army represented by the United States Army Corp of Engineers (USACE) conducted a preliminary reconnaissance of the Harpeth River Watershed and found over 850 structures in the regulated floodplain within the basin located in the City of Brentwood, City of Franklin, Williamson County, and Davidson County. In addition, they found aquatic ecosystem issues throughout the basin primarily involving stream bank erosion and loss of riparian buffers.

On June 13, 2013, the USACE, City of Franklin, Metropolitan Nashville and Davidson County, City of Brentwood, and Williamson County signed an initial Feasibility Study Agreement to analyze alternative flood risk management options. The feasibility study evaluated numerous flood risk management options and provided an analysis of cost and benefits associated with various projects. The USACE determined that two projects were considered economically justified. These two projects included Franklin Road channel modifications and nonstructural home raisings. With support from the Board of Mayor and Aldermen, one or both measures could have become the Feasibi...

Click here for full text