File #: 18-0455    Version: 1 Name:
Type: Resolution Status: Filed
File created: 4/27/2018 In control: Work Session
On agenda: 6/12/2018 Final action: 6/12/2018
Title: Consideration of Resolution 2018-37, A Resolution To Approve An Alternative Preliminary Design Concept For The 100-Block Battle Avenue Drainage Improvements Project And Authorize Staff To Complete Right-Of-Way Acquisition, Final Design And Construction (04/26/18 CIC recommended Option 2B to BOMA 3-0) (05/08/18 WS to 6/12/18 Work session; 6/12/18 WS referred to 6/26/18 WS).
Sponsors: Paul Holzen
Attachments: 1. BATTLE AVE PRESENTATION 4-2018.pdf, 2. Res 2018-37 Battle Ave Drainage Improvements_with Exhibit A.Law Approved, 3. Stormwater Forecast - FY 2019-2022.pdf
Related files: 18-0340

DATE: April 6, 2018

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
Paul Holzen, Director of Engineering
Jonathan Marston, Assistant Director of Engineering


SUBJECT:

title
Consideration of Resolution 2018-37, A Resolution To Approve An Alternative Preliminary Design Concept For The 100-Block Battle Avenue Drainage Improvements Project And Authorize Staff To Complete Right-Of-Way Acquisition, Final Design And Construction (04/26/18 CIC recommended Option 2B to BOMA 3-0) (05/08/18 WS to 6/12/18 Work session; 6/12/18 WS referred to 6/26/18 WS).
body

Purpose
The purpose of this memorandum is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning the Battle Ave Project.

Background
On November 26, 2013, the Board of Mayor and Aldermen approved a Professional Services Agreement (COF Contract 2013-0180) with Neel-Schaffer, Inc. for engineering design services, including additional drainage modeling and preparation of contract plans and specifications, on the 100 Block Battle Avenue Drainage Improvements Project.

On December 9, 2014 Resolution 2014-50, A Resolution to Approve the Preliminary Design and Authorize Staff to Proceed with Final Design, Right-of-Way Acquisition and Construction Bidding Phase for the 100 Block Battle Avenue Drainage improvements project.

On April 28, 2015, the Board of Mayor and Aldermen approved amendment no. 1 to the Professional Services Agreement (COF Contract 2013-0180) for additional engineering design services on the 100 Block Battle Avenue Drainage Improvements Project.

On October 10, 2017, the Board of Mayor and Aldermen approved a Professional services Agreement (COF Contract No. 2017-0251) with R. Rhett Turner, MAI for Right-of-Way Acquisition Services for the Battle Avenue Stormwater Project.

Staff has always assumed that the majority of the property owners would be willing to dedicate the easements associated with the project. Some of the proper...

Click here for full text