File #: 18-0250    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 3/9/2018 In control: Franklin Municipal Planning Commission
On agenda: 4/26/2018 Final action: 4/26/2018
Title: 1st And Main, Site Plan, A Commercial Structure Consisting of 37,955 Square Feet On 2.23 Acres, Located At 95 & 99 East Main Street. (CONSENT AGENDA)
Attachments: 1. MAP 6626 1st and Main SP, 2. Conditions of Approval_01 1st and Main, 3. 1st and Main, site plan (Mixed Use) - submittal 004, 4. PDF to FMPC Mixed Use project 1st and Main, 5. COA 99 E Main St demolition + conceptual new construction 2.12.18, 6. February 2018 HZC Meeting Minutes, 7. HZC Staff report 99 E Main St demolition new construction 2.12.18, 8. HZC Staff report 99 E Main St new construction (architectural features materials) 3.12.18, 9. March 2018 HZC Meeting Minutes

DATE: April 18, 2018

TO: Franklin Municipal Planning Commission

FROM: Joey Bryan, Planner
Amy Diaz-Barriga, Current Planning Supervisor
Emily Hunter, Director of Planning and Sustainability

Subject
title
1st And Main, Site Plan, A Commercial Structure Consisting of 37,955 Square Feet On 2.23 Acres, Located At 95 & 99 East Main Street. (CONSENT AGENDA)
body

Project Information
COF Project Number: 6626
Applicant: Jack Parker, Catalyst Design Group
Owner: Crossfire Investments, LLC, Preston Ingram, Rep.

Background/Staff Comments
1st & Main is a commercial development featuring retail, office, & restaurant space. The two-story building will be 37, 955 square feet on 2.23 acres located at 95 & 99 East Main Street. The property is zoned Central Commercial (CC) and is located in the Central Franklin Character Area Overlay special area 1 (CFCO-1). Staff reviewed and accepted the submitted parking study for shared parking between the uses on this site, and also with the adjacent bank. A final plat consolidating the two lots will need to be approved prior to issuance of a building permit.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. The applicant shall upload the corrected plan to the online plan review website (https://franklin.contractorsplanroom.com/secure/). All revisions to the approved plans shall be "clouded." With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.
2. Once the corrected site plan has been approved, one (1) full-size and one (1) half-size copy of the final approved landscape plans shall be submitted to the Department of Building and Neighborhood Services for future landscape inspection purposes.
3. Once the project has obtained Site Plan approval, the applicant w...

Click here for full text