File #: 18-0135    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 2/5/2018 In control: Franklin Municipal Planning Commission
On agenda: 2/22/2018 Final action: 2/22/2018
Title: October Park PUD Subdivision, Final Plat, Creating 19 Detached Residential Lots and Three Open-Space Lots on 11.88 Acres, Located At 1100 Ridgeway Drive. (CONSENT AGENDA)
Attachments: 1. MAP October Park PUD FP Sec 1, 2. October Park PUD_FP_COAs, 3. OCTOBER PARK FINAL PLAT SET 013118

DATE: February 14, 2018

TO: Franklin Municipal Planning Commission

FROM: Joey Bryan, Planner
Amy Diaz-Barriga, Current Planning Supervisor
Emily Hunter, Director of Planning and Sustainability

Subject
title
October Park PUD Subdivision, Final Plat, Creating 19 Detached Residential Lots and Three Open-Space Lots on 11.88 Acres, Located At 1100 Ridgeway Drive. (CONSENT AGENDA)
body

Project Information
COF Project Number: 6618
Applicant: Manly Thwealt, Huddleston Steele Engineering, Inc.
Owner: Debar Land Company, LLC, Gary Armstrong, Rep.

Background/Staff Comments
The purpose of this plat is to create nineteen detached residential lots and three open space lots on 11.88 acres at 1100 Ridgeway Drive. The Development Plan for the October Park PUD Subdivision was previously approved on February 10, 2015.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The mylar shall be 18 inches by 24 inches in size. The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review. With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.
2. The city's project identification number shall be included on all correspondence wit...

Click here for full text