File #: 18-0087    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 1/15/2018 In control: Franklin Municipal Planning Commission
On agenda: 1/25/2018 Final action: 1/25/2018
Title: Stream Valley PUD Subdivision, Final Plat, Section 13, Revision 1, (Lots 431-434 & 495), Revision Of 5 Residential Lot Lines And Floodplain Boundary On 4.97 Acres, Located Within The Stream Valley PUD Subdivision, At 431, 432, 433, And 434 Coffenbury Court And A 3.91 Acre Open Space Lot Behind All Four Lots. (CONSENT AGENDA)
Sponsors: Franklin Municipal Planning Commission, Josh King
Attachments: 1. MAP_StreamValleyFP.pdf, 2. Stream Valley Sec 13 Plat Revision 1 12-20-17 signed.pdf, 3. Boeh Owner Affidavit (Signed).pdf, 4. SV Sec 13 Conditions of Approval_01.pdf

DATE: January 17, 2018

TO: Franklin Municipal Planning Commission

FROM: Josh King, Principal Planner
Amy Diaz-Barriga, Current Planning Supervisor
Emily Hunter, Director of Planning and Sustainability

Subject
title
Stream Valley PUD Subdivision, Final Plat, Section 13, Revision 1, (Lots 431-434 & 495), Revision Of 5 Residential Lot Lines And Floodplain Boundary On 4.97 Acres, Located Within The Stream Valley PUD Subdivision, At 431, 432, 433, And 434 Coffenbury Court And A 3.91 Acre Open Space Lot Behind All Four Lots. (CONSENT AGENDA)
body

Project Information
COF Project Number: 6532
Applicant: Clay Wallace, Energy Land amd Infrastructure LLC.
Owner: NVR Homes LLC & Michael + Anna Marie Boeh

Background/Staff Comments
A previous Final Plat was approved and recorded for this section in September of 2016. The Floodplain for lots 431-434 & 495 was shown incorrectly, and this plat records changes to the floodplain that were impacting these four single-family residential lots. Lot 495 is an open space lot that contains the floodplain and the COF Floodway Fringe Zoning Overlay District. 212 Coffenbury Court is the only occupied home impacted by this plat. An owner affidavit was submitted from this owner and is included in the attachments to this report.

Recommendation
recommendation
Approval, with conditions .
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electron...

Click here for full text