File #: 17-0904    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 10/16/2017 In control: Franklin Municipal Planning Commission
On agenda: 10/26/2017 Final action: 10/26/2017
Title: Ovation Subdivision, Final Plat, Revision 2, Creating One New Lot and Re-subdividing Five of the Nine Lots, On 58.22 Acres, Located At The Intersection Of McEwen Drive And Ovation Parkway. (CONSENT AGENDA)
Attachments: 1. Map 6539 Ovation Final Plat, 2. 6539 Ovation FP Rev 2 Conditions of Approval_01, 3. 6539 Ovation Subd FP Rev 2

DATE: October 18, 2017

TO: Franklin Municipal Planning Commission

FROM: Amy Diaz-Barriga, Current Planning Supervisor
Emily Hunter, Director of Planning and Sustainability

Subject
title
Ovation Subdivision, Final Plat, Revision 2, Creating One New Lot and Re-subdividing Five of the Nine Lots, On 58.22 Acres, Located At The Intersection Of McEwen Drive And Ovation Parkway. (CONSENT AGENDA)
body

Project Information
COF Project Number: 6539
Applicant: Brad Thomas, Barge, Waggoner, Sumner and Cannon, Inc.
Owner: Brian Reames, Representing Highwoods Realty LP

Background/Staff Comments
This plat realigns several lots based on changes to the floodplain that occurred from the construction along Carothers Parkway and McEwen Drive. The additional lot created is due to an area formally within the FFO that is now segregated by Ovation Parkway.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The mylar shall be 18 inches by 24 inches in size. The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review. With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.
2. The city's project identification number shall be incl...

Click here for full text