DATE: July 20, 2016
TO: Franklin Municipal Planning Commission
FROM: Joseph Bryan, Planner
Bob Martin, Interim Director of Planning and Sustainability
Subject
title
Stream Valley PUD Subdivision, final plat, section 13, creating 33 single-family lots and two open spaces on 16.77 acres located at Lewisburg Pike and Stream Valley Boulevard. (CONSENT AGENDA)
body
Project Information
COF Project Number: 6171
Applicant: Clay Wallace, Energy Land & Infrastructure, LLC
Owner: Stream Valley Partners, LLC, Rep: Tyler Ring
Background/Staff Comments
The applicant is submitting a final plat to create 33 single-family residential lots and two open spaces. The total site area is 16.77 acres. The site plan was approved as Stream Valley Site Plan Section 13 in June of 2014.
Project Considerations
Project Considerations are not conditions of this approval, but are intended to highlight issues that should be considered in the overall site design or may be required when more detailed plans are submitted for review. These items are not meant to be exhaustive and all City requirements and ordinances must be met with each plan submittal.
None.
Modifications of Standards
None.
Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.
PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the outline plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit three (3) paper copies and a .pdf file of the corrected plat, along with the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within (5) business days of the corrected electronic plat being uploaded to the onlin...