File #: 15-0842    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 9/9/2015 In control: Franklin Municipal Planning Commission
On agenda: 9/24/2015 Final action: 9/24/2015
Title: Lockwood Glen PUD Subdivision, final plat, section 6, 25 residential lots and 1 open space lot on 4.02 acres located at 0 South Carothers Road. (CONSENT AGENDA)
Attachments: 1. Lockwood Glen Section 6 FP Map.pdf, 2. Lockwood Glen PUD Subdivsion, Final Plat, Section 6 - submittal 002.pdf, 3. 5919 Conditions of Approval_01.pdf

DATE: 9/16/2015

TO: Franklin Municipal Planning Commission

FROM: Brad Baumgartner, Planner
Bob Martin, Interim Director of Planning and Sustainability

Subject
title
Lockwood Glen PUD Subdivision, final plat, section 6, 25 residential lots and 1 open space lot on 4.02 acres located at 0 South Carothers Road. (CONSENT AGENDA)
body

Project Information
COF Project Number: 5919
Applicant: Clay Wallace, Energy Land and Infrastructure, LLC
Owner: Crescent Lockwood, LLC

Background/Staff Comments
The applicant is submitting a final plat to create 25 single family lots and 1 open space lot on 4.02 acres within the Lockwood Glen PUD Subdivision. The development plan was last revised and approved on 4/14/2014 (Project Number 4528) and the site plan was approved 5/20/2014 (Project Number 2980). This plat meets the requirements of the Subdivision Regulations and Zoning Ordinance.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit three (3) paper copies and a .pdf file of the corrected plat, along with the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review. With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or comp...

Click here for full text