DATE: September 26, 2019
TO: Board of Mayor and Aldermen
FROM: Eric Stuckey, City Administrator
Paul Holzen, Director of Engineering
Jonathan Marston, Assistant Director of Engineering
William Banks, Staff Engineer
SUBJECT:
title
Consideration of Amendment No. 5 to the Professional Services Agreement (COF Contract No. 2014-0209) with CT Consultants, Inc. for the Preparation of Final Plans and Specifications for the Franklin Road Corridor (Streetscape) Improvements Project, from the Harpeth River Bridge to Harpeth Industrial Court, at a Cost INCREASE Not-to-Exceed $52,000.00.
body
Purpose
The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning DRAFT Amendment No. 5 to the Professional Services Agreement (PSA) with CT Consultants, Inc. (CTC) for the Preparation of Final Plans and Specifications for the Franklin Road Corridor (Streetscape) Improvements Project, from the Harpeth River Bridge to Harpeth Industrial Court.
Background
The history of this PSA (COF Contract No. 2014-0209) with CTC is as follows:
October 14, 2014 - BOMA approved COF Contract No. 2014-0209 authorizing CTC to complete the remaining steps to finalize the Franklin Road construction plans and specifications. Because the project was shelved for 5 years, additional funds were required to update the survey and complete the design.
February 9, 2016 - BOMA approved Amendment No. 1 to convert the originally designed decorative Metal Halide street lights to LED light fixtures.
June 11, 2017 - BOMA approved Amendment No. 2 to update the project design based upon several factors: inclusion of 3 new fiber line utilities now occupying MTEMC utility poles; the addition of two 10'x18' box culvert bridge structures recommended for installation at the Harpeth River per the Army Corp of Engineers' Franklin Road Feasibility Study; and right-of-way and easement coordination with recently developed water and sanitary sewer plans...