File #: 15-0211    Version: 1 Name:
Type: Report Status: Agenda Ready
File created: 2/11/2015 In control: Board of Mayor & Aldermen
On agenda: 5/26/2015 Final action: 4/28/2015
Title: Follow Up Discussion Regarding Resolution 2015-28, A Resolution Concerning Appropriation Of Funds To Franklin First United Methodist Church (COF Project 2665) (Resolution 2015-28 Approved at 04/28/15 BOMA - Option C)
Sponsors: Eric Stuckey
Attachments: 1. Franklin First United Methodist Church - Letter, 2. MAP Franklin first United Methodist Church.pdf, 3. Res 2015-28 Resolution for Franklin First United Methodist Churchs DP Comments.pdf
DATE: March 13, 2015

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
David Parker, City Engineer/CIP Executive
Paul Holzen, Director of Engineering

SUBJECT: .title
Follow Up Discussion Regarding Resolution 2015-28, A Resolution Concerning Appropriation Of Funds To Franklin First United Methodist Church (COF Project 2665) (Resolution 2015-28 Approved at 04/28/15 BOMA - Option C)
body

Purpose
The purpose of this memorandum is to provide the Board of Mayor and Aldermen (BOMA) with information to consider an appropriation of funds to Franklin First United Methodist Church for improvements made at the intersection of Mack Hatcher and Aldersgate Way.

Background
Resolution 2010-40, A Resolution Approving a Concept Plan for Franklin First United Methodist Church, Totaling 106.15 Acres Located at 111 Daniel McMahon Lane, was unanimously approved by the BOMA at the July 27, 2010 Board of Mayor and Aldermen Meeting. As part of their development, the developer (Franklin First United Methodist Church) was required to complete the following improvements:
1) Signal Design and Intersection Improvements at Mack Hatcher Parkway and Aldersgate Way
2) Aldersgate Way Design and Construction
3) 8' Wide Multiuse Trail and Pedestrian Bridge Construction
4) Public Access Easement Serving City of Franklin Property

Below is a summary of the improvements and estimated cost from the developer:

Signal Design and Intersection Improvements at Mack Hatcher Parkway and Aldersgate Way
The Department Review Team required the developer to upgrade the existing signal at Mack Hatcher and Spencer Creek Road to provide a 2nd access to their property. In addition, the developer is to make grading, drainage and pavement modifications to the median on Mack Hatcher to install two left turn storage bays. Below is a summary of the cost associated with these improvements:

$ 9,000.00 Signal Design Fee (RPM Transportation Grou...