File #: 15-0753    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 8/12/2015 In control: Franklin Municipal Planning Commission
On agenda: 8/27/2015 Final action: 8/27/2015
Title: Robert Crosby Subdivision, final plat, 2 lot subdivision on 1 acre, located at 209 Lewisburg Avenue.
Attachments: 1. Robert Crosby Subd, FP MAP, 2. 5867 Conditions of Approval, 3. Robert Crosby Subdivision - submittal 002

DATE: August 19, 2015

TO: Franklin Municipal Planning Commission

FROM: Amy Diaz-Barriga, Current Planning Supervisor
Bob Martin, Interim Director of Planning and Sustainability

Subject
title
Robert Crosby Subdivision, final plat, 2 lot subdivision on 1 acre, located at 209 Lewisburg Avenue.
body

Project Information
COF Project Number: 5867
Applicant: Christopher Wood, Kiser + Vogrin Design
Owner: Robert Crosby

Background/Staff Comments
The site has two buildings on a single lot, separated by a pool. Both buildings are principle structures. This final plat will place each building on its own lot. The plat meets the requirements of the Zoning Ordinance and the Subdivision Regulations. Street frontage will be maintained for each lot. The minimum required lot width for Lot 2 will be maintained. A variance was granted by the BZA on April 2, 2015, to allow the existing pool to remain in the proposed front setback of Lot 2. This site lies within the Historic Preservation Overlay; therefore, the Historic Zoning Commission will have to grant approval of both demolition and construction on both lots. A readdressing of the 200 range of Lewisburg Avenue will need to be approved by the Planning Commission before this subdivision can be approved.

Project Considerations
A combined driveway apron shall be constructed with the property at 211 Lewisburg Avenue). A driveway permit from TDO shall be obtained, posting surety as needed. The apron is to be completed and accepted prior to initiating the final building inspection.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit one paper copy of the corrected plat, along with the Mylar, to the Department...

Click here for full text