File #: 18-0095    Version: 1 Name:
Type: Contract/Agreement Status: Agenda Ready
File created: 1/18/2018 In control: Capital Investment Committee
On agenda: 1/25/2018 Final action:
Title: Consideration of DRAFT Amendment No. 1 to the Professional Services Agreement (COF Contract No. 2017-0007) with Barge Design Solutions, Inc., formerly known as Barge Waggoner Sumner & Cannon, Inc., for the Design of Intersection Improvements at East McEwen Drive and Cool Springs Boulevard for a Cost Increase Not-to-Exceed $11,200.00
Sponsors: Engineering
Attachments: 1. C2017-0007_Amend1_EMcEwenRndabt, 2. C2017-0007_Amend1_Scope_EMcEwenRndabt

DATE: January 25, 2018

TO: Board of Mayor and Aldermen

FROM: Eric Stuckey, City Administrator
Paul Holzen, City Engineer/Director of Engineering
Jonathan Marston, Assistant Director of Engineering

SUBJECT:
title
Consideration of DRAFT Amendment No. 1 to the Professional Services Agreement (COF Contract No. 2017-0007) with Barge Design Solutions, Inc., formerly known as Barge Waggoner Sumner & Cannon, Inc., for the Design of Intersection Improvements at East McEwen Drive and Cool Springs Boulevard for a Cost Increase Not-to-Exceed $11,200.00
body

Purpose
The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning Amendment No. 1 to the Professional Services Agreement (PSA) (COF Contract No. 2017-0007) with Barge Waggoner Sumner & Cannon, now known as Barge Design Solutions, Inc., for the design of intersection improvements at East McEwen Drive and Cool Springs Boulevard.

Background
On February 14, 2017, the BOMA approved a PSA (COF Contract No. 2017-0007) with Barge Waggoner Sumner & Cannon, Inc. (BWSC) to design improvements for the roundabout at East McEwen Drive and Cool Springs Boulevard/Oxford Glen Drive. The purpose of these improvements is to correct operational issues at the roundabout that have occurred since its full opening in 2014.

At the time of the original PSA, the project team did not anticipate any changes to the existing street lights at the roundabout. Therefore, this design service was not included in the PSA. As the design has progressed, we have learned that the lighting system will need to be altered. These additional design services warrant an increase in the design fee. Also, with the start of the new year, BWSC has rebranded as Barge Design Solutions, Inc.

Amendment No. 1 will allow for the design of lighting system modifications.

Financial Impact
On October 25, 2016, the BOMA approved Resolution 2016-69, which formally adopted the Phase 1 project list for ...

Click here for full text