File #: 16-0457    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 5/13/2016 In control: Franklin Municipal Planning Commission
On agenda: 5/26/2016 Final action: 5/26/2016
Title: Poe Subdivision, Revision 1, Lots 3 & 4, final plat, revision of setback lines on 0.45 acres, located at 226 and 230 11th Avenue South (Consent Agenda)
Sponsors: Franklin Municipal Planning Commission, Josh King
Attachments: 1. 6112_PoeSubd_Conditions of Approval_01.pdf, 2. MAP_6112 Poe SubD.pdf, 3. Poe Subdivision - Revision to Lots 3 4 5-08-16.pdf

DATE: 4/20/2016

TO: Franklin Municipal Planning Commission

FROM: Josh King, Senior Planner
Bob Martin, Interim Director of Planning and Sustainability

Subject
title
Poe Subdivision, Revision 1, Lots 3 & 4, final plat, revision of setback lines on 0.45 acres, located at 226 and 230 11th Avenue South (Consent Agenda)
body

Project Information
COF Project Number: 6112
Applicant: J.R. Faulk, Dividing Line Surveyors
Owner: Zach McKinney, Capstone Homes LLC

Background/Staff Comments
The applicant is proposing to revise the front setback lines of vacant lots located at 226 and 230 11th Ave South. The setback consistent with the built structures along this street is 15 feet from the edge of the right of way. The revised setback proposed by the applicant is consistent with the established setback along the street.

Recommendation
recommendation
Approval, with conditions.
end
See attached pages for a list of staff recommended conditions of approval.

PROCEDURAL REQUIREMENTS:
1. In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review. With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.
2. The city's project identification number shall be included on all correspondence with any city departm...

Click here for full text