File #: 16-1048    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 11/30/2016 In control: Franklin Municipal Planning Commission
On agenda: 12/15/2016 Final action: 12/15/2016
Title: McEwen Place PUD Subdivision, Final Plat, Section 3, Revision 2 (Northside At McEwen), Six Lots On 44.9 Acres, Located Near The Intersection Of Rush Street And East McEwen Drive. (CONSENT AGENDA)
Sponsors: Franklin Municipal Planning Commission, Josh King
Attachments: 1. MAP_6306McEwenPlacePUDSubdivisionFP.pdf, 2. McEwenPlace_FP.pdf, 3. PLAT_McEwenPlace.pdf

 

DATE:                                                               December 9, 2016

 

TO:                                          Franklin Municipal Planning Commission

 

FROM:                                          Josh King, Principal Planner

                                          Amy Diaz-Barriga, Current Planning Supervisor

                                          Emily Hunter, Director of Planning and Sustainability

 

Subject

title

McEwen Place PUD Subdivision, Final Plat, Section 3, Revision 2 (Northside At McEwen), Six Lots On 44.9 Acres, Located Near The Intersection Of Rush Street And East McEwen Drive. (CONSENT AGENDA)                     

body

 

Project Information

COF Project Number:                                          6303

Applicant:                                                               Roger Harrah, Harrah Group

Owner:                                                               Adam Ballash, Boyle Nashville

 

Background/Staff Comments

This final plat supports the development plan revision for McEwen Place PUD Subdivision as approved by FMPC at the 11/9/2016 Special FMPC meeting.  An infrastructure site plan has been administratively approved for the properties, and two site plans for the development are alongside the final plat on this December 15, 2016 FMPC agenda.

 

Recommendation

recommendation

Approval, with conditions. 

end

See attached pages for a list of staff recommended conditions of approval.

 

PROCEDURAL REQUIREMENTS:                     

1.                     In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review.  With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.

2.                     The city’s project identification number shall be included on all correspondence with any city department relative to this project.

3.                     The applicant shall upload a .dwg copy of the final plat through the IDT system (link above) in Tennessee state plan coordinates, NAD 83, NAVD 88, zone 4100/5301 for incorporation of the plat into the Franklin GIS database.