File #: 15-0302    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 3/12/2015 In control: Franklin Municipal Planning Commission
On agenda: 3/26/2015 Final action: 3/26/2015
Title: Andover Park PUD Subdivision, final plat, 5 lots on 1.57 acres, located at 1126 Liberty Pike. (CONSENT AGENDA)
Attachments: 1. 5789 Andover Park PUD Subd, FP MAP, 2. 5789 Andover Park PUD Subd, FP, Conditions of Approval_edited, 3. 5789 ANDOVER FINAL PLAT
 
DATE:                  March 18, 2015
 
TO:            Franklin Municipal Planning Commission
 
FROM:            Amy Diaz-Barriga, Principal Planner
            Catherine Powers, Director of Planning and Sustainability
 
Subject
title
Andover Park PUD Subdivision, final plat, 5 lots on 1.57 acres, located at 1126 Liberty Pike. (CONSENT AGENDA)            
body
 
Purpose
The purpose of this memo is to provide information to the Franklin Municipal Planning Commission (FMPC) concerning a final plat for a five lot subdivision at 1126 Liberty Pike.
 
Project Information
COF Project Number:      5789
Applicant:            Bob Haemmerlein, Gamble Design Collaborative
Owner:            Old South Construction of Tennessee, LLC; rep: J.C. Franks
 
Background/Staff Comments
The development plan for this PUD subdivision was recommended for approval by FMPC in October 2013, and was approved by BOMA in December 2013.  The site plan was approved administratively in March 2014.  The final plat matches the approved site plan and meets the subdivision regulations.
 
Recommendation
recommendation
Staff recommends approval, with conditions.  
end
See attached pages for a list of staff recommended conditions of approval.
 
PROCEDURAL REQUIREMENTS:      
1.      In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit three (3) paper copies and a .pdf file of the corrected plat, along with the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review.  With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.
2.      The city's project identification number shall be included on all correspondence with any city department relative to this project.
3.      The applicant shall upload a .dwg copy of the final plat through the IDT system (link above) in Tennessee state plan coordinates, NAD 83, NAVD 88, zone 4100/5301 for incorporation of the plat into the Franklin GIS database.