Skip to main content
File #: 16-0723    Version: 1 Name:
Type: Report Status: Passed
File created: 8/18/2016 In control: Capital Investment Committee
On agenda: 8/25/2016 Final action: 8/25/2016
Title: Discussion Concerning Upcoming Utility Maintenance and Paving in the Thompson Alley Neighborhood
Sponsors: Engineering
Attachments: 1. ThompsonAlley_Exhibits.pdf

 

DATE:                                                               August 25, 2016

 

TO:                                          Board of Mayor and Aldermen

 

FROM:                                          Eric Stuckey, City Administrator

                                          Paul Holzen, City Engineer/Director of Engineering

                                          Mark Hilty, Director of Water Management

                                          Joe York, Director of Streets                     

                                          

SUBJECT:                                          

title

Discussion Concerning Upcoming Utility Maintenance and Paving in the Thompson Alley Neighborhood

body

 

Purpose

The purpose of this memo is to provide information to the Franklin Board of Mayor and Aldermen (BOMA) concerning upcoming work in the Thompson Alley neighborhood to replace aging utility infrastructure and the subsequent repaving of Thompson Alley.

 

Background

The Water Management Department has budgeted to replace the aging water and sewer infrastructure (e.g. Exhibits A and B) in the Thompson Alley area.  There has also been some concern about the accessibility of emergency vehicles around this area.  The replacement of the water and sewer lines will cause significant damage to the existing asphalt surface.  Therefore, the Streets Department will repave the streets following the water and sewer line replacements.  In an effort to make the area more accessible to emergency vehicles, staff is proposing to repave Thompson Alley to create a 16-foot wide (e.g. City of Franklin standard alley width is 16 feet) loop.  The remaining back-half of Thompson Alley would simply be repaved to its current width of approximately 10 feet.  This can be better seen in Exhibit C.

 

It is important to understand that this is simply an improvement to existing infrastructure.  Staff DOES NOT PROPOSE any new pedestrian or multi-use facilities with this project.

 

The proposed work is expected to be complete by the end of the 2016 calendar year.  Staff also proposes a neighborhood meeting before the start of any work.

 

Financial Impact

The estimated cost of this project is $209,500, with a more detailed breakdown, including anticipated funding sources, shown below:

Recommendation

rec

Staff recommends commencement of this proposed work by City staff and on-call annual contractors.