Skip to main content
File #: 15-0494    Version: 1 Name:
Type: Ordinance Status: Passed
File created: 5/13/2015 In control: Board of Mayor & Aldermen
On agenda: 8/11/2015 Final action: 8/11/2015
Title: Consideration Of Ordinance 2015-09, To Be Entitled, "An Ordinance To Zone +/- 30.11 Acres Into The Height Overlay District (HTO) For The Property Located At The Southeast Corner Of Interstate 65 And McEwen Drive." (05/28/15 FMPC 8-0; 06/09/15 1ST Reading BOMA 7-0; 7/14/15 2nd Reading 8-0) THIRD AND FINAL READING
Sponsors: Ald. Ann Petersen
Attachments: 1. Ord 2015-09 Franklin Summit HTO rezoning - Copy, 2. 5834 Franklin Summit Rezoning MAP, 3. HTO map, 4. Franklin Summit HTO Rezoning PLANS

 

DATE:                                                               May 20, 2015

 

TO:                                          Franklin Municipal Planning Commission

 

FROM:                                          Amy Diaz-Barriga, Principal Planner

 

Subject

title

Consideration Of Ordinance 2015-09, To Be Entitled, “An Ordinance To Zone +/- 30.11 Acres Into The Height Overlay District (HTO) For The Property Located At The Southeast Corner Of Interstate 65 And McEwen Drive.” (05/28/15 FMPC 8-0; 06/09/15 1ST Reading BOMA 7-0; 7/14/15 2nd Reading 8-0) THIRD AND FINAL READING                                          

body

 

Purpose

The purpose of this memo is to provide information to the Franklin Municipal Planning Commission (FMPC) concerning a rezoning for a 30.11 acre property located at the southeast corner of Interstate 65 and McEwen Drive.

 

Project Information

COF Project Number:                     5834

Applicant:                                          Scotty Bernick, Ragan Smith

Owner:                                          SS McEwen 65, LLC  Rep: Glenn Wilson

 

Background/Staff Comments

This site is made up of three parcels, and is bordered by I-65 and Huffine’s Ridge Drive to the west and McEwen Drive to the north.  The property is currently zoned General Commercial (GC).  Currently the Height Overlay District (HTO) is assigned to several properties within immediate vicinity of this site (see provided map).   Staff acknowledges that this corner of the intersection has the highest elevation, but is aware that the owner was granted an appeal of a staff decision to prohibit mass grading on its steep slopes.   Staff is also confident that any future development of the site will be subject to transitional features in regards to heights.  Further, the purpose of the HTO “is to allow for buildings with building heights that exceed 75 feet in specific areas, such as along the Interstate-65 corridor, where such heights create a unique development form but allow for special review to ensure proper fire protection for tall buildings where there may be a high concentration of residents or employees.”  Therefore, Staff feels that the location of the site, as well as its proximity to the existing HTO boundary, justifies extending the HTO boundary to this property. 

 

Project Considerations

Project Considerations are not conditions of this approval, but are intended to highlight issues that should be considered in the overall site design or may be required when more detailed plans are submitted for review.  These items are not meant to be exhaustive and all City requirements and ordinances must be met with each plan submittal. 

 

Traffic Impact Study based on an acceptable Memorandum of Understanding are to be submitted with the development plan.  Scope of needed traffic counts has been arranged with Brandon Baxter of RSA.

 

Recommendation

recommendation

Staff recommends a favorable recommendation to BOMA. 

end

See attached pages for a list of staff recommended conditions of approval.

 

PROCEDURAL REQUIREMENTS:                     

1.                     Fifteen (15) half-size copies of the Rezoning shall be submitted to the Department of Planning and Sustainability by 9am on the Monday after the Planning Commission meeting in order to be placed on the Board of Mayor and Aldermen agenda.

2.                     The city’s project identification number shall be included on all correspondence with any city department relative to this project.