Legislation Details

File #: 16-0655    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 7/28/2016 In control: Franklin Municipal Planning Commission
On agenda: 8/25/2016 Final action: 8/25/2016
Title: Riverbluff PUD Subdivision, final plat, section 4, 21 single family residential lots on 4.64 acres, located along Riverbluff Drive and Cabell Drive. (Consent Agenda)
Attachments: 1. 6201 Riverbluff PUD Subd, FP, Sec 4 Map.pdf, 2. 6201 Riverbluff FP Sec 4 Conditions of Approval_01.pdf, 3. Riverbluff PUD Subdivision, final plat, section 4 - submittal 002.pdf

 

DATE:                                                               8/17/2016

 

TO:                                          Franklin Municipal Planning Commission

 

FROM:                                          Brad Baumgartner, Senior Planner

                                          Emily Hunter, Director of Planning and Sustainability

 

Subject

title

Riverbluff PUD Subdivision, final plat, section 4, 21 single family residential lots on 4.64 acres, located along Riverbluff Drive and Cabell Drive. (Consent Agenda)                     

body

 

Project Information

COF Project Number: 6201

Applicant: Greg Terry, Terry & Associates

Owner: James Cross

 

Background/Staff Comments

The purpose of this plat is to create 21 single family lots and 1 open space lot and dedicate right-of-way for Section 4 of Riverbluff PUD Subdivision. The site plan was approved by FMPC on 7/28/2016 (COF# 6176).

 

Recommendation

recommendation

Approval, with conditions. 

end

See attached pages for a list of staff recommended conditions of approval.

 

PROCEDURAL REQUIREMENTS:                     

1.                     In addition to uploading the corrected plat to the online plan review website (https://franklin.contractorsplanroom.com/secure/), the applicant shall submit the Mylar, to the Department of Building and Neighborhood Services (Suite 110, Franklin City Hall). The Certificates of Approval for the Subdivision Name and Street Names, Water System (if not COF Water), Survey, and Ownership shall be signed when the plat is resubmitted. The Mylar shall be submitted to BNS within five (5) business days of the corrected electronic plat being uploaded to the online plan review website (or vice versa) or the item shall be rejected as incomplete for City review.  With the resubmittal, each condition of approval/open issue in the online plan review system shall contain a full response from the applicant as to the satisfaction or completion of that condition.

2.                     The city’s project identification number shall be included on all correspondence with any city department relative to this project.